RECENT REFERENCES

POSITION

PROJECT NAME AND LOCATION

EMPLOYER

PROJECT VALUE IN HRK

CONSTR. PERIOD


DESCRIPTION OF WORKS

1)

SECTION:
TUNNEL BREZIK - BRIDGE GACKA

Hrvatske autoceste d.o.o., Zagreb
(BECHTEL INTERNATIONAL INC.)

13.416.646

2004

Construction of route in the length of 600 m

2)

TUNNEL >PLASINA<

Hrvatske autoceste d.o.o., Zagreb
(SUBTERRA a.s. PRAHA ČEŠKA)

262.901.631

2004

Construction of two tunnel tubes in the length of 2x2,30 km and tunnel route in the length of 2x2,30 km

3)

SECTION: VRPOLJE-PRGOMET

Hrvatske autoceste d.o.o., Zagreb
(INGRA d.d.,Zagreb)

9.647.719

2004

Construction of route in the length of 1,18 km

4)

SECTION: BENKOVAC-PIROVAC

Hrvatske autoceste d.o.o., Zagreb
(INGRA d.d., Zagreb)

11.618.007

2004

Construction of route in the length of 0,75 km and intersection Pirovac

5)

BRIDGE >KLIČEVICA<

Hrvatske autoceste d.o.o., Zagreb
(OSIJEK KOTEKS d.d., Osijek)

25.820.724

2004

Construction of structure of surface 5.870 m2

6)

VIADUCT >RAŠTEVIĆ<

Hrvatske autoceste d.o.o., Zagreb
(OSIJEK KOTEKS d.d., Osijek)

14.685.112

2004

Construction of structure of surface 3.900 m2

7)

SECTION: SKRADIN-ŠIBENIK

Hrvatske autoceste d.o.o., Zagreb
(VIADUKT d.d., Zagreb)

27.445.457

2005

Construction of route in the length of 1,85 km

8)

BRIDGE >DABAR<

Hrvatske autoceste d.o.o., Zagreb

67.113.863

2005

Construction of structure of surface 9.760 m2

9)

VIADUCT >RADOVIĆI<

Hrvatske autoceste d.o.o., Zagreb

261.540.937

2007

Construction of structure of surface 14.062 m2

10)

SECTION ZAGVOZD - RAVČA

Hrvatske autoceste d.o.o., Zagreb

269.092.062

2007

Construction of route in the length of 8,69 km and viaduct Dubrave of surface 7.581 m2

11)

SECTION PLOČE 1 - LUKA PLOČE

Hrvatske autoceste d.o.o., Zagreb

152.855.177

2008

Construction of route in the length of 9,72 km, viaduct Radonjić of surface 5.962 m2 and tunnel Zmijarevići in the length of 276 m1

12)

SECTION:
JUŠIĆI - JURDANI, TUNNEL >JUŠIĆI<

Hrvatske autoceste d.o.o., Zagreb
(OSIJEK KOTEKS d.d., Osijek)

44.440,084

2004

Construction of route in the length of 1,10 km and tunnel tubes in the length of 2x0,320 km and tunnel route in the length of  0,320 km

13)

SEMI-MOTORWAY KUPJAK-VRBOVSKO

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb
(VIADUKT d.d., Zagreb)

44.024.098

2004

Construction of the first viaduct >Severinske Drage< for the full profile motorway, of surface 9.593 m2

14)

VIADUCT >SEVERINSKE DRAGE<

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

48.278.812

2004

Construction of structure of surface 9.588 m2

15)

VIADUCT >SEVERINSKE DRAGE<

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

78.315.697

2007

Construction of the second viaduct >Severinske Drage< for the full profile motorway, of surface 9.593 m2

16)

TUNNEL >VELIKI GLOŽAC<

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

46.720.401

2007

On section Vrbovsko - Bosiljevo, construction of second tunnel tube in the length of L=1.126 m' and tunnel route in the length of L=1.126 m'

17)

SECTION KIKOVICA - OŠTROVICA

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

86.244.448

2006

(Upgrade to full profile motorway), construction of route in the length of 2,08 km and viaduct Čičave of surface 8.754 m2 and Veliki Svib of surface 10.902 m2

18)

SECTION OŠTROVICA - VRATA

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

306.965.044

2007

(Upgrade to full profile motorway), construction of route in the length of 12,44 km, tunnel Hrasten in the length of 223 m, tunnel Tuhobić in the length of 2143 m, intersections Oštrovica and Vrata and closed drainage system

19)

TUNNEL VRŠEK

AUTOCESTA RIJEKA-ZAGREB d.d., Zagreb

66.783.545

2007

(Upgrade to full profile motorway), construction of second tunnel tube, in the length of 859 m1

20)

SECTION: ŽUPANJA - LIPOVAC, SUBSECTION: ŽUPANJA - SPAČVA

HRVATSKE AUTOCESTE d.o.o., Zagreb

38.053.912

2006

Construction of route in the length of 15,95 km and structures on the route, intersection Spačva

21)

SECTION ĐAKOVO - SREDANCI

HRVATSKE AUTOCESTE d.o.o., Zagreb

559.787.842

2007

Construction of route in the length of 4,01 km and structures on the route

22)

SECTION OSIJEK - ĐAKOVO

HRVATSKE AUTOCESTE d.o.o., Zagreb

161.100.982

2008

Construction of route in the length of 4,01 km and structures on the route

23)

SECTION: ŠIBENIK - TROMILJA, SUBSECTION: INTERSECTION >RAŽINE< -DUBRAVA

HRVATSKE CESTE d.o.o., Zagreb

78.604.662

2005

Construction of route in the length of  4,30 km, intersection >Vidici<, overpass >Slavica<, construction of  tunnel >Dumbočica< in the length of 500 m and tunnel route in the length of L=500 m

24)

SECTION: OREHOVICA - SVETI KUZAM

HRVATSKE CESTE d.o.o., Zagreb

363.640.903

2007.

Construction of route in the length of 2,535 km, intersection  >Sv. Kuzam< with the route in the length of  700 m', construction of  tunnel >Sveti Kuzam<-two tunnel tubes in the length of 289,02 m' and 299,20m', construction of tunnel >Draga< - two tunnel tubes in the length of 154,00 m' and 213,00 m'. Construction of viaduct: Sv. Kuzam north-surface 2.060 m2 , Sv. Kuzam south-surface 3.010 m2, Sv. Kuzam ramp 1-surface 1.630 m2 , Sv. Kuzam ramp 4- surface 425 m2 and viaduct Bukovo- surface 1.680 m2, construction of culverts and pedestrian passages

25)

TUNNEL >PEĆINE<,

HRVATSKE CESTE d.o.o., Zagreb

198.769.059

2007.

Construction of three- and four-lane tunnel tube in the length of 1.343m', cross section surface is 116-156 m2

26)

SECTION: PODI-KRIŽICE

HRVATSKE CESTE d.o.o., Zagreb

71.874.526

2006.

Construction of route in the length of 1,462 km, overpass >Dugopolje-2<, underpass >Orgus<, drainage and water protection, alternative roads and retaining, construction of  tunnel >Orgus<, two tunnel tubes in the length of 345 m and 380 m and tunnel route.

27)

BRIDGE DRAVA

HRVATSKE CESTE d.o.o., Zagreb

73.506.694

2007.

Construction of structure of surface 7.039 m2